About the project

  • Date: April - 2019
  • Client: FASTLINK 4G
  • Category:
  • Address: Erbil, IRAQ
This is one of our main project.

A huge swap project for  Fastlink 4G Company in 3 Big cities ( Erbil, Duhok, and Sulaymaniyah), Its a huge OPEX deduction and cost saving by keeping the Telecom site working on Lithium Ion batteries instead of DGs.

 

   Hybrid Cabinet Main Future.

1-   Implementing a fully-integrated rectifier system and energy storage to provide reliable and efficient telecom power supply.

2- Remote controlling and  monitoring system enables easier management and lowers maintenance costs of remote stations.

3- Reducing operation costs by up to 80% by storing power using Lithium ion batters.

4- have a good air conditioner to keep telecom devices and batters on the specified temperature degree.