“Power project in Baghdad”
A huge power project has been implemented in Baghdad for Asiacell company (Data-Center), we installed 4 generators each 770 KVA capacity, all Gen-sets have been synchronized together and connected to central power station room which contains 3-1500 Ampere ATS, which supply the data-center with power.
SkyRay technical team did a great job during the implementation with excellent quality, our customer was very satisfied with our professional work and perfect achieving.
About the project
- Date: Nov-2021
- Client: AsiaCell
- Category: Energy
- Address: Iraq, Baghdad